Rotating Headlines from this Weblog! Click to view Post!

Rotating Headlines

Join this Weblog!

To become a Follower of this Weblog.
Click on the "Follow" link, underneath the list of current followers. You will be taken to an information panel where you may enter your personal details and other information. When completed, the title of this Weblog will appear in the Reading List on your Blogger Dashboard, and your Profile Picture will be displayed next to other Followers!

Followers to my Weblog!

Showing posts with label Big Peninsula tunnel E.Warburton. Show all posts
Showing posts with label Big Peninsula tunnel E.Warburton. Show all posts

Monday, June 25, 2012

O'Shannassy Aqueduct Trail - the tunnel section

Seat at top of the Boardwalk

Marker - 16 km to O'Shannassy Weir

Open channel converts into the tunnel

Open channel converts into the tunnel
Gate at Mt Donna Buang Rd

The O'Shannassy Aqueduct was built in the years 1911-1915, and decommissioned in 1997.

The Trail follows the former Aqueduct Maintenance Track, starting at Parrot Rd (Launching Place) and ending at the O'Shannassy Weir (East Warburton), about 31 km total.

The Aqueduct consists of open channel and underground steel pipes.

As the Trail is a step-on, step-off route, these are the sectors:

Parrot Rd to Ewart's Rd 4 km (pipe)

Ewart's Rd to Dee Rd 5.3 km

Dee Rd to Sussex St 4 km

Sussex St to Yuonga Rd 3 km

Yuonga Rd to Cement Creek 6.8 km

Cement Creek to O'Shannassy Weir 7.6 km

An interesting feature of the Trail is the recently completed Boardwalk. This is reached from the Mt Donna Buang Rd crossing, about 1 km past the end of the Yuonga Rd section. It starts at an open channel section of the Aqueduct along the Maintenance Track.

This Boardwalk passes over the pipeline, deep in the side of Mt Donna Buang.

I visited the tunnel section on June 24, 2012.

A comprehensive set of Trail Notes, and detailed maps, may be downloaded from the Parks Victoria Web site:

http://parkweb.vic.gov.au/__data/assets/pdf_file/0007/315628/Park-note-Yarra-Ranges-NP-OShannassy-Aquaduct-Trail.pdf

The history and development of the aqueduct may be viewed at

http://www.aussieheritage.com.au/listings/vic/Warburton/OShannassyWeirAqueductandAssociatedFeatures/17556

See all of the Photos of my visit!

Thursday, June 21, 2012

O'Shannassy Aqueduct Trail - east of Cement Creek crossing

Cement Creek
The Aqueduct and Trail
 Now part of the Yarra Ranges National Park, the O'Shannassy Aqueduct Trail is a long, step-on, step-off 27 km walking/cycling/horse route starting at Don Rd, Launching Place, and ending at the O'Shannassy Weir, about 80 km east of Melbourne, near the town of Warburton.

Inside the Hut
The Aqueduct was constructed between 1911 and 1915, and decommissioned in 1997. The maintenance track, known as Road 18, has been opened up progressively for walkers, horse-riders and cyclists, following transfer of land ownership from Melbourne Water to Parks Victoria.

The old steel pipe
The Trail passes through magnificent Mountain Ash forest, past fern gullies, with excellent views across the Yarra Valley towards Mt Little Joe and the mountains near Big Pats Creek. It winds its way around the base of Mt Donna Buang and Ben Cairn, passing many aqueduct engineering works, bridges, syphons, huts, distance marker posts and old maintenance sheds.

Control valve machinery
New access gates for management vehicles and walkers have been built at various locations along the route.

Sadly, there has been massive encroachment of vegetation, fallen trees, branches, and weeds in the Aqueduct.

Closeup of the original pipe
I have completed 23 km of the full Trail (46 km return), in several trips!

My photo albums of these trips may be viewed at http://worldisround.com/home/bobpadula/index.html.

A comprehensive set of Trail Notes, and detailed maps, may be downloaded from the Parks Victoria Web site:

http://parkweb.vic.gov.au/__data/assets/pdf_file/0007/315628/Park-note-Yarra-Ranges-NP-OShannassy-Aquaduct-Trail.pdf

The history and development of the aqueduct may be viewed at

http://www.aussieheritage.com.au/listings/vic/Warburton/OShannassyWeirAqueductandAssociatedFeatures/17556

On June 20, 2012, I did a review exploration of about 4 km (return) of the section of the Trail easterly from the new gate at the end of Cement Creek Rd.

About 1 km from the Cement Creek Rd entry point the former maintenance hut and workshop remain - the hut is available for hikers and cyclists, and contains a fireplace, lounge chairs, a bed, and table! This hut is at the junction of the open section of the Aqueduct with the steel pipe section. The control valves and machinery are still intact!

Warning: The top section of Cement Creek Rd is unsuitable for small 2WD vehicles. It is badly potholed and rutted, with large stones, and after heavy rain becomes very muddy. If this is a problem, there is a turning point about half way along the road, where small cars may be parked, and about ten minutes hike to the end of the road.

Some of the management Roads in the area are prohibited to walkers, as they are located in the Melbourne Water catchment area - these are prominently signed, with gates. Walkers should not venture along these tracks.

See all of the Photos of my visit!

Monday, July 20, 2009

Peninsula Tunnels east of Warburton



About 14 km east of Warburton, 70 km from Melbourne, on the Upper Yarra Reservoir Rd there is a signposted turnoff to the Little Peninsula Tunnel Picnic Ground.

There are barbecue facilities and a short walk to the Little Peninsula Tunnel which was created to alter the course of the river in the goldmining era so that the prospectors could scour the river bed.

The Tunnel can also be reached from the upper car park, which is linked by a short track to the picnic ground.

Another tunnel is at the Big Peninsula, about 1 km further east along the highway, and tracks lead down from the small car park, to either side of the Tunnel. A small picnic area is at the bottom of the stairway.

The Goldfields Walking Trail starts nearby.


A new Information Board has been constructed at the Big Peninsula Tunnel viewing point. New wooden stairways and rails have also been built.


I visited the area on Sunday afternoon July 19, 2009.

See the full set of Photos of my visit